This list, originally compiled by Martin Baumann, attempts to document all dates when Britain's railways were electrified (and, in some cases, de-electrified or closed).
The line sections are named as convenient identifiers. Start date is the first day of normal timetabled operation. Dates given for 'closed' are as for electric traction (the line may have closed to all traffic or been de-electrified) and where possible denote the last day of electric operation.
Note that the table is large and can take a long time to sort.
The company (or BR region) responsible for each electrification scheme is given in the last column.
Line section from | Line section via | Line section to | Date opened | Date closed (last train) | System | Note | Co. |
---|---|---|---|---|---|---|---|
Alexandra Dock | Herculaneum Dock | 6 February 1893 | 1920s | third rail; 500V DC centre rail | converted to third rail; 500V DC side rail | LOR | |
Alexandra Dock | Seaforth Sands | 30 April 1894 | 1920s | third rail; 500V DC centre rail | converted to third rail; 500V DC side rail | LOR | |
Dingle | Herculaneum Dock | 21 December 1896 | 1920s | third rail; 500V DC centre rail | converted to third rail; 500V DC side rail | LOR | |
Waterloo | Bank | 8 August 1898 | 25 October 1940 | third rail; 550V DC (later 600V) centre rail | converted to third rail; 660V/750V DC side rail | LSW | |
Hamilton Square | Birkenhead Park | 2 May 1903 | third rail; 660V/750V DC | MerR | |||
James Street | Rock Ferry | 2 May 1903 | third rail; 660V/750V DC | MerR | |||
Liverpool Central Low Level | James Street | 2 May 1903 | 28 July 1975 | third rail; 660V/750V DC | MerR | ||
Exchange Junction | Southport | 22 March 1904 | third rail; 660V/750V DC | LY | |||
Liverpool Exchange | Exchange Junction | 22 March 1904 | 29 April 1977 | third rail; 660V/750V DC | LY | ||
Southport | Crossens | 22 March 1904 | 5 September 1964 | third rail; 660V/750V DC | LY | ||
Southport South Junction | St Lukes Junction | 22 March 1904 | 1966 | third rail; 660V/750V DC | non passenger only | LY | |
New Bridge Street | Benton | 29 March 1904 | 17 June 1967 | third rail; 660V/750V DC | NE | ||
Benton | Monkseaton | 6 June 1904 | 17 June 1967 | third rail; 660V/750V DC | NE | ||
Monkseaton | Tynemouth | 21 June 1904 | 17 June 1967 | third rail; 660V/750V DC | NE | ||
Manors South Junction | Newcastle Central | 1 July 1904 | 17 June 1967 | third rail; 660V/750V DC | NE | ||
Percy Main | Riverside Junction | 1 July 1904 | 17 June 1967 | third rail; 660V/750V DC | NE | ||
Tynemouth | Manors South Junction | 1 July 1904 | 17 June 1967 | third rail; 660V/750V DC | NE | ||
Heaton South Junction | Benton Junctions | 25 July 1904 | 17 June 1967 | third rail; 660V/750V DC | NE | ||
Argyle Street (Manors) | Quayside | 5 June 1905 | 29 February 1964 | overhead; 600V DC | line closed 15 June 1969 | NE | |
Seaforth Sands | Seaforth and Litherland | 2 July 1905 | 1920s | third rail; 500V DC centre rail | converted to third rail; 500V DC side rail | LOR | |
Richmond | Turnham Green | 1 August 1905 | third rail; 660V/750V DC | District Railway services over LSWR route; voltage may be 600V or 630V, since uprated to 750V | LSW | ||
Wimbledon | Putney Bridge | 27 August 1905 | third rail; 660V/750V DC | District Railway services over LSWR route; voltage may be 600V or 630V, since uprated to 750V | LSW | ||
Primrose Road Junction | crossover to L&Y route | 25 March 1906 | 24 March 1956 | third rail; 660V/750V DC | LOR | ||
Marsh Lane Junction | Aintree | 1 June 1906 | third rail; 660V/750V DC | LY | |||
North Mersey Branch Junction | Sefton Junction | 1 June 1906 | 2 April 1951 | third rail; 660V/750V DC | regular service ceased, used once a year thence for Grand National; last electric train 24 March 1956 | LY | |
Sandhills Junction | Aintree | 19 November 1906 | third rail; 660V/750V DC | junction moved to Exchange 18 June 1968, restored 1977 | LY | ||
Heysham | Morecambe | 13 April 1908 | 11 February 1951 | overhead; 6,600V AC 25Hz | MR | ||
Morecambe | Lancaster Green Ayre | 8 June 1908 | 11 February 1951 | overhead; 6,600V AC 25Hz | MR | ||
Torrisholme Junction No 1 | Torrisholme Junction No 2 | 8 June 1908 | 11 February 1951 | overhead; 6,600V AC 25Hz | Morecambe avoiding line | MR | |
Lancaster Green Ayre | Lancaster Castle | 14 September 1908 | 11 February 1951 | overhead; 6,600V AC 25Hz | MR | ||
Manors South Junction | New Bridge Street | 1 January 1909 | 17 June 1967 | third rail; 660V/750V DC | NE | ||
Hawkshead Street Junction | Meols Cop | 15 February 1909 | 7 September 1964 | third rail; 660V/750V DC | connection to Meols Cop works remained until 14 February1970 | LY | |
Roe Lane Junction | Meols Cop Junction | 15 February 1909 | third rail; 660V/750V DC | LY | |||
Aintree | Maghull | 10 October 1909 | third rail; 660V/750V DC | LY | |||
London Victoria | London Bridge | 10 December 1909 | 16 June 1928 | overhead; 6,700V AC | South London Line, converted to third rail; 660V/750V DC | LBSC | |
London Victoria | Streatham Hill | Crystal Palace Low Level | 12 May 1911 | 2 March 1929 | overhead; 6,700V AC | converted to third rail; 660V/750V DC | LBSC |
Maghull | Town Green | 3 July 1911 | third rail; 660V/750V DC | LY | |||
Crystal Palace | Norwood Junction | Selhurst depot | 1 June 1912 | 29 September 1929 | overhead; 6,700V AC | converted to third rail; 660V/750V DC | LBSC |
Peckham Rye | Tulse Hill | Crystal Palace/Streatham Hill | 1 June 1912 | 16 June 1928 | overhead; 6,700V AC | converted to third rail; 660V/750V DC | LBSC |
Town Green | Ormskirk | 1 April 1913 | third rail; 660V/750V DC | LY | |||
Bury Bolton Street | Holcombe Brook | 29 July 1913 | 28 March 1918 | overhead; 3,500V DC | converted to third rail; 1,200V DC side contact | LY | |
Willesden Junction High Level | Earl's Court | 1 May 1914 | 19 October 1940 | third rail; 660V/750V DC | re-electrified as far as former Earl's Court Junction 29 September 1996 | LNW | |
North Mersey Branch Junction | Gladstone Dock | 7 September 1914 | 7 July 1924 | third rail; 660V/750V DC | LY | ||
Middridge Sidings | Bowesfield West | 1 July 1915 | 5 January 1935 | overhead; 1,500V DC | NE | ||
London Waterloo | Clapham Junction | East Putney | 25 October 1915 | third rail; 660V/750V DC | LSW | ||
Shildon Yard | Middridge Sidings | 30 October 1915 | 5 January 1935 | overhead; 1,500V DC | NE | ||
Bowesfield West | Erimus Yard | 22 November 1915 | 5 January 1935 | overhead; 1,500V DC | NE | ||
Erimus Yard | Newport East | 10 January 1916 | 5 January 1935 | overhead; 1,500V DC | NE | ||
London Waterloo | Kingston Loop | 30 January 1916 | third rail; 660V/750V DC | LSW | |||
London Waterloo | Shepperton branch | 30 January 1916 | third rail; 660V/750V DC | LSW | |||
Hounslow Loop | 12 March 1916 | third rail; 660V/750V DC | LSW | ||||
Buckley Wells Junction | Bury Bolton Street | 17 April 1916 | 14 March 1980 | third rail; 1,200V DC side contact | LY | ||
Crumpsall | Buckley Wells Junction | 17 April 1916 | 16 August 1991 | third rail; 1,200V DC side contact | LY | ||
Manchester Victoria | Crumpsall | 17 April 1916 | 13 July 1991 | third rail; 1,200V DC side contact | LY | ||
New Malden | Surbiton | Hampton Court | 18 June 1916 | third rail; 660V/750V DC | LSW | ||
Broad Street | Dalston Junction | 10 October 1916 | 27 June 1986 | third rail; 660V/750V DC | LNW | ||
Camden Road West Junction | Willesden Junction High Level | 10 October 1916 | 28 October 1995 | third rail; 660V/750V DC | converted to overhead; 25kV AC | LNW | |
Dalston Junction | Camden Road West Junction | 10 October 1916 | third rail; 660V/750V DC | LNW | |||
Willesden Junction High Level | Gunnersbury | 10 October 1916 | third rail; 660V/750V DC | LNW | |||
South Acton | Kew Bridge | 10 October 1916 | third rail; 660V/750V DC | LNW | |||
Surbiton | Claygate | 12 November 1916 | third rail; 660V/750V DC | LSW | |||
Queen's Park | Watford Junction | 16 April 1917 | third rail; 660V/750V DC | LNW | |||
Bury Bolton Street | Holcombe Brook | 29 March 1918 | 4 May 1952 | third rail; 1,200V DC side contact | converted from overhead; 3,500V DC; Tottington Junction-Holcombe Brook de-electrified 25 March 1951 | LY | |
Alexandra Dock | Herculaneum Dock | 1920s | 30 December 1956 | third rail; 500V DC side rail | LOR | ||
Alexandra Dock | Seaforth Sands | 1920s | 30 December 1956 | third rail; 500V DC side rail | LOR | ||
Dingle | Herculaneum Dock | 1920s | 30 December 1956 | third rail; 500V DC side rail | LOR | ||
Seaforth Sands | Seaforth and Litherland | 1920s | 30 December 1956 | third rail; 500V DC side rail | LOR | ||
Camden Road West Junction | Camden Junction | 10 July 1922 | 22 September 1992 | third rail; 660V/750V DC | also overhead; 25kV AC from 18 April 1988 (dual system) | LNW | |
Euston | Queen's Park | 10 July 1922 | third rail; 660V/750V DC | LNW | |||
Watford High Street | Croxley Green | 30 October 1922 | 22 March 1996 | third rail; 660V/750V DC | LNW | ||
Balham | Selhurst, East Croydon | Coulsdon North | 1 April 1925 | 22 September 1929 | overhead; 6,700V AC | converted to third rail; 660V/750V DC | LBSC |
Selhurst | West Croydon | Sutton | 1 April 1925 | 22 September 1929 | overhead; 6,700V AC | converted to third rail; 660V/750V DC | LBSC |
Tulse Hill | Streatham Common | 1 April 1925 | 22 September 1929 | overhead; 6,700V AC | converted to third rail; 660V/750V DC | LBSC | |
London Holborn Viaduct | Herne Hill | 12 July 1925 | third rail; 660V/750V DC | Holborn Viaduct closed 26 January 1990 | SR | ||
Brixton/Loughborough Junction | Nunhead, Catford | Shortlands | 12 July 1925 | third rail; 660V/750V DC | SR | ||
Nunhead (Cow Lane Junction) | Crystal Palace High Level | 12 July 1925 | 18 September 1954 | third rail; 660V/750V DC | SR | ||
Claygate | Effingham Junction | 12 July 1925 | third rail; 660V/750V DC | SR | |||
Leatherhead | Guildford | 12 July 1925 | third rail; 660V/750V DC | SR | |||
London Victoria | Herne Hill, Beckenham Junction | Orpington | 12 July 1925 | third rail; 660V/750V DC | SR | ||
Raynes Park | Dorking | 12 July 1925 | third rail; 660V/750V DC | SR | |||
Elmers End | Hayes | 21 September 1925 | third rail; 660V/750V DC | SR | |||
London Charing Cross/Cannon Street | London Bridge, Ladywell, Elmers End | Addiscombe | 28 February 1926 | third rail; 660V/750V DC | Elmers End-Addiscombe closed 31 May 1997 | SR | |
New Beckenham | Beckenham Junction | 28 February 1926 | third rail; 660V/750V DC | SR | |||
New Cross | Grove Park | Orpington/Bromley North | 28 February 1926 | third rail; 660V/750V DC | SR | ||
London Charing Cross/Cannon Street | (all routes except Lewisham-Hither Green connection) | Dartford | 19 July 1926 | third rail; 660V/750V DC | SR | ||
Watford High Street | Rickmansworth Church Street | 26 September 1927 | 2 March 1952 | third rail; 660V/750V DC | LMS | ||
London Bridge | Forest Hill, East Croydon, Purley | Caterham/Tattenham Corner | 25 March 1928 | third rail; 660V/750V DC | SR | ||
Sydenham | Crystal Palace Low Level | 25 March 1928 | third rail; 660V/750V DC | SR | |||
Sutton | Epsom Downs [new] | 17 June 1928 | third rail; 660V/750V DC | SR | |||
Epsom Downs [new] | Epsom Downs [old] | 17 June 1928 | 13 February 1989 | third rail; 660V/750V DC | last 900 feet closed with new Epsom Downs station | SR | |
London Victoria | London Bridge | 17 June 1928 | third rail; 660V/750V DC | South London Line, converted from overhead; 6,700V AC | SR | ||
Peckham Rye | Tulse Hill | Crystal Palace/Streatham Hill | 17 June 1928 | third rail; 660V/750V DC | converted from overhead; 6,700V AC | SR | |
Rutland Street | Southend (Mumbles) | 2 March 1929 | 5 January 1960 | overhead; 650V DC | trial running began 6 July 1928 | SM | |
Southend (Mumbles) | Pier | 2 March 1929 | 11 October 1959 | overhead; 650V DC | trial running began 6 July 1928 | SM | |
Crystal Palace Low Level | Beckenham Junction | 3 March 1929 | third rail; 660V/750V DC | SR | |||
London Victoria | Streatham Hill | Crystal Palace Low Level | 3 March 1929 | third rail; 660V/750V DC | converted from overhead; 6,700V AC | SR | |
Streatham | Sutton | Epsom | 3 March 1929 | third rail; 660V/750V DC | SR | ||
Streatham | Haydons Road | Wimbledon | 3 March 1929 | third rail; 660V/750V DC | SR | ||
Wimbledon | Wimbledon Chase | New Merton | 7 July 1929 | third rail; 660V/750V DC | new line | SR | |
Balham | Selhurst, East Croydon | Coulsdon North | 23 September 1929 | third rail; 660V/750V DC | converted from overhead; 6,700V AC; Purley-Coulsdon North closed 30 September 1983 | SR | |
Selhurst | West Croydon | Sutton | 23 September 1929 | third rail; 660V/750V DC | converted from overhead; 6,700V AC | SR | |
Tulse Hill | Streatham Common | 23 September 1929 | third rail; 660V/750V DC | converted from overhead; 6,700V AC | SR | ||
Crystal Palace | Norwood Junction | Selhurst depot | 30 September 1929 | third rail; 660V/750V DC | converted from overhead; 6,700V AC | SR | |
South Merton | South Merton, Morden South, St Helier, Sutton Common | Sutton | 5 January 1930 | third rail; 660V/750V DC | new line | SR | |
Dartford | Gravesend | 6 July 1930 | third rail; 660V/750V DC | SR | |||
Hounslow Loop | Staines | Windsor & Eton Riverside | 6 July 1930 | third rail; 660V/750V DC | SR | ||
Wimbledon | Mitcham | West Croydon | 6 July 1930 | 31 May 1997 | third rail; 660V/750V DC | SR | |
Manchester London Road | Manchester Oxford Road | 11 May 1931 | 14 September 1958 | overhead; 1,500V DC | converted to overhead; 25kV AC | LMS; LNE | |
Manchester Oxford Road | Altrincham | 11 May 1931 | 30 April 1971 | overhead; 1,500V DC | converted to overhead; 25kV AC | LMS; LNE | |
Purley | Redhill and Quarry Line | Three Bridges/Reigate | 17 July 1932 | third rail; 660V/750V DC | SR | ||
Brighton/Preston Park | Hove | West Worthing | 1 January 1933 | third rail; 660V/750V DC | SR | ||
Three Bridges | Brighton | 1 January 1933 | third rail; 660V/750V DC | SR | |||
Hither Green | Hither Green | 16 July 1933 | third rail; 660V/750V DC | SR | |||
Bickley/Chislehurst | St Mary Cray | 1 May 1934 | third rail; 660V/750V DC | SR | |||
Orpington | Sevenoaks | 6 January 1935 | third rail; 660V/750V DC | SR | |||
St Mary Cray | Otford | Sevenoaks | 6 January 1935 | third rail; 660V/750V DC | SR | ||
Brighton | Lewes-Eastbourne | Ore | 7 July 1935 | third rail; 660V/750V DC | SR | ||
Haywards Heath | Horsted Keynes | 7 July 1935 | 27 October 1963 | third rail; 660V/750V DC | SR | ||
Wivelsfield | Lewes | Seaford | 7 July 1935 | third rail; 660V/750V DC | SR | ||
Nunhead | Lewisham | 30 September 1935 | third rail; 660V/750V DC | SR | |||
Woodside | Sanderstead | 30 September 1935 | 13 May 1983 | third rail; 660V/750V DC | re-energised May 1986 along with a new short section of line from South Croydon to Sanderstead | SR | |
Staines | Weybridge | 3 January 1937 | third rail; 660V/750V DC | SR | |||
Surbiton | Woking | Guildford | 3 January 1937 | third rail; 660V/750V DC | SR | ||
Woking | Farnham | 3 January 1937 | third rail; 660V/750V DC | SR | |||
Farnham | Alton | 4 July 1937 | third rail; 660V/750V DC | SR | |||
Guildford | Haslemere | Portsmouth Harbour | 4 July 1937 | third rail; 660V/750V DC | SR | ||
Bidston East Junction | New Brighton | 13 March 1938 | third rail; 660V/750V DC | LMS | |||
Bidston East Junction | West Kirby | 13 March 1938 | third rail; 660V/750V DC | LMS | |||
Birkenhead Park | Bidston East Junction | 13 March 1938 | third rail; 660V/750V DC | LMS | |||
Castle Junction | South Shields | 14 March 1938 | 7 January 1963 | third rail; 660V/750V DC | LNE | ||
Motspur Park | Malden Manor | Tolworth | 29 May 1938 | third rail; 660V/750V DC | new line | SR | |
Bognor branch | 3 July 1938 | third rail; 660V/750V DC | SR | ||||
Dorking | Horsham | 3 July 1938 | third rail; 660V/750V DC | SR | |||
Littlehampton branch | 3 July 1938 | third rail; 660V/750V DC | SR | ||||
Three Bridges | Horsham | Ford | 3 July 1938 | third rail; 660V/750V DC | SR | ||
West Worthing | Havant | 3 July 1938 | third rail; 660V/750V DC | SR | |||
Tolworth | Chessington South | 25 May 1939 | third rail; 660V/750V DC | new line | SR | ||
Aldershot | Guildford | 2 July 1939 | third rail; 660V/750V DC | SR | |||
Ascot | Ash Vale | 2 July 1939 | third rail; 660V/750V DC | SR | |||
Frimley | Sturt Lane Junction | Frimley-Brookwood | 2 July 1939 | third rail; 660V/750V DC | SR | ||
Gravesend | Strood | Maidstone West | 2 July 1939 | third rail; 660V/750V DC | SR | ||
Otford | Maidstone East | 2 July 1939 | third rail; 660V/750V DC | SR | |||
Swanley | Gillingham | 2 July 1939 | third rail; 660V/750V DC | SR | |||
Virginia Water | Ascot | Reading | 2 July 1939 | third rail; 660V/750V DC | SR | ||
Waterloo | Bank | 28 October 1940 | 29 May 1993 | third rail; 660V/750V DC | converted to fourth rail; 660V DC | SR | |
Crayford spur | 11 October 1942 | third rail; 660V/750V DC | SR | ||||
Newhaven Marine branch | 16 July 1947 | third rail; 660V/750V DC | SR | ||||
Barnsley Junction | Wath Central Junction | 2 February 1952 | 20 July 1981 | overhead; 1,500V DC | deviation 4m 18ch to 4m 68ch in place 1 May 1967 and original route closed; installation scheme started under LNE | BR(E) | |
Penistone | Durnford Bridge | 2 February 1952 | 18 July 1981 | overhead; 1,500V DC | closed to passengers 4 January 1970; installation scheme started under LNE | BR(E) | |
Penistone Huddersfield Junction | Barnsley Junction | 2 February 1952 | 18 July 1981 | overhead; 1,500V DC | closed to passengers 4 January 1970; installation scheme started under LNE | BR(E) | |
Wath Central Junction | Wath Yard | 2 February 1952 | 20 July 1981 | overhead; 1,500V DC | installation scheme started under LNE | BR(E) | |
Heysham | Morecambe | 17 August 1953 | 1 January 1966 | overhead; 6,600V AC 50Hz | BR(M) | ||
Lancaster Green Ayre | Lancaster Castle | 17 August 1953 | 1 January 1966 | overhead; 6,600V AC 50Hz | BR(M) | ||
Morecambe | Lancaster Green Ayre | 17 August 1953 | 1 January 1966 | overhead; 6,600V AC 50Hz | BR(M) | ||
Torrisholme Junction No 1 | Torrisholme Junction No 2 | 17 August 1953 | 1 January 1966 | overhead; 6,600V AC 50Hz | Morecambe avoiding line | BR(M) | |
Crowden | Hadfield | 1 March 1954 | 18 July 1981 | overhead; 1,500V DC | closed to passengers 4 January 1970; installation scheme started under LNE | BR(E) | |
Hadfield | Godley Junction | 1 March 1954 | 7 December 1984 | overhead; 1,500V DC | converted to overhead; 25kV AC; installation scheme started under LNE | BR(E) | |
Durnford Bridge | Crowden | 14 June 1954 | 18 July 1981 | overhead; 1,500V DC | closed to passengers 4 January 1970; installation scheme started under LNE | BR(E) | |
Godley Junction | Manchester London Road | 14 June 1954 | 7 December 1984 | overhead; 1,500V DC | converted to overhead; 25kV AC; installation scheme started under LNE | BR(E) | |
Hadfield | Glossop | 14 June 1954 | 7 December 1984 | overhead; 1,500V DC | converted to overhead; 25kV AC; installation scheme started under LNE | BR(E) | |
Sheffield Victoria | Stocksbridge Deepcar Junction | 20 September 1954 | 20 July 1981 | overhead; 1,500V DC | closed to passengers 15 May 1983; installation scheme started under LNE | BR(E) | |
Stocksbridge Deepcar Junction | Penistone | 20 September 1954 | 20 July 1981 | overhead; 1,500V DC | closed to all traffic 15 May 1983; installation scheme started under LNE | BR(E) | |
Rotherwood Sidings | Sheffield Victoria | 3 January 1955 | 20 July 1981 | overhead; 1,500V DC | installation scheme started under LNE | BR(E) | |
Colchester | Clacton/Walton | 16 March 1959 | overhead; 25kV AC | BR(E) | |||
Faversham | Canterbury East | Dover Marine | 15 June 1959 | third rail; 660V/750V DC | Kent Coast phase 1; Dover Marine closed 19 November 1994 | BR(S) | |
Gillingham | Faversham | Ramsgate | 15 June 1959 | third rail; 660V/750V DC | Kent Coast phase 1 | BR(S) | |
Sittingbourne | Sheerness | 15 June 1959 | third rail; 660V/750V DC | Kent Coast phase 1 | BR(S) | ||
Crewe | Styal, Stockport | Manchester Oxford Road | 12 September 1960 | overhead; 25kV AC | BR(M) | ||
Manchester Piccadilly | Manchester Oxford Road | 12 September 1960 | overhead; 25kV AC | previously electrified overhead; 1,500V DC 11 May 1931-14 September 1958 | BR(M) | ||
Balloch | Balloch Central | 5 November 1960 | 23 April 1988 | overhead; 25kV AC | Officially opened 5 November 1960; demonstration trains 6 November 1960; public service 7 November 1960; service suspended after traffic 17 December 1960; service reinstated 1 October 1961 | BR(Sc) | |
Balloch Central | Balloch Pier | 5 November 1960 | 28 September 1986 | overhead; 25kV AC | Officially opened 5 November 1960; demonstration trains 6 November 1960; public service 7 November 1960; service suspended after traffic 17 December 1960; service reinstated 1 October 1961 | BR(Sc) | |
Bellgrove Junction | Airdrie | 5 November 1960 | overhead; 25kV AC | Officially opened 5 November 1960; demonstration trains 6 November 1960; public service 7 November 1960; service suspended after traffic 17 December 1960; service reinstated 1 October 1961 | BR(Sc) | ||
Bellgrove Junction | Springburn | 5 November 1960 | 1 August 1979 | overhead; 6.25kV AC | Officially opened 5 November 1960; demonstration trains 6 November 1960; public service 7 November 1960; service suspended after traffic 17 December 1960; service reinstated 1 October 1961 | BR(Sc) | |
Dalmuir Park Junction | Drumchapel | Hyndland Junctions | 5 November 1960 | 1 November 1978 | overhead; 6.25kV AC | Officially opened 5 November 1960; demonstration trains 6 November 1960; public service 7 November 1960; service suspended after traffic 17 December 1960; service reinstated 1 October 1961 | BR(Sc) |
Dalreoch Junction | Balloch | 5 November 1960 | overhead; 25kV AC | Officially opened 5 November 1960; demonstration trains 6 November 1960; public service 7 November 1960; service suspended after traffic 17 December 1960; service reinstated 1 October 1961 | BR(Sc) | ||
Helensburgh Central | Dalmuir Park Junction | 5 November 1960 | overhead; 25kV AC | Officially opened 5 November 1960; demonstration trains 6 November 1960; public service 7 November 1960; service suspended after traffic 17 December 1960; service reinstated 1 October 1961 | BR(Sc) | ||
High Street West Junction | Bridgeton | 5 November 1960 | 1 June 1979 | overhead; 6.25kV AC | Officially opened 5 November 1960; demonstration trains 6 November 1960; public service 7 November 1960; service suspended after traffic 17 December 1960; service reinstated 1 October 1961 | BR(Sc) | |
Jordanhill | Glasgow Queen Street Low Level | Bellgrove Junction | 5 November 1960 | 1 June 1979 | overhead; 6.25kV AC | Officially opened 5 November 1960; demonstration trains 6 November 1960; public service 7 November 1960; service suspended after traffic 17 December 1960; service reinstated 1 October 1961 | BR(Sc) |
Singer Works Junction | Singer Works | 5 November 1960 | 8 May 1967 | overhead; 6.25kV AC | Officially opened 5 November 1960; demonstration trains 6 November 1960; public service 7 November 1960; service suspended after traffic 17 December 1960; service reinstated 1 October 1961. Closed to passengers 20 March 1964 | BR(Sc) | |
Westerton Junction | Milngavie | 5 November 1960 | 1 November 1978 | overhead; 6.25kV AC | Officially opened 5 November 1960; demonstration trains 6 November 1960; public service 7 November 1960; service suspended after traffic 17 December 1960; service reinstated 1 October 1961 | BR(Sc) | |
Yoker | Jordanhill | 5 November 1960 | 1 November 1978 | overhead; 6.25kV AC | Officially opened 5 November 1960; demonstration trains 6 November 1960; public service 7 November 1960; service suspended after traffic 17 December 1960; service reinstated 1 October 1961 | BR(Sc) | |
Yoker | Dalmuir Park Junction | 5 November 1960 | 1 March 1979 | overhead; 6.25kV AC | Officially opened 5 November 1960; demonstration trains 6 November 1960; public service 7 November 1960; service suspended after traffic 17 December 1960; service reinstated 1 October 1961 | BR(Sc) | |
Fenchurch Street | Gas Factory Junction | 6 November 1960 | overhead; 25kV AC | previously electrified overhead; 1,500V DC 26 September 1949-4 November 1960 (no regular service until 6 November 1961) | BR(E) | ||
Gas Factory Junction | Bow Junction | 6 November 1960 | overhead; 25kV AC | previously electrified overhead; 1,500V DC 26 September 1949-4 November 1960 (never used for regular service) | BR(E) | ||
Liverpool Street | Shenfield | 6 November 1960 | 24 January 1979 | overhead; 6.25kV AC | previously electrified overhead; 1,500V DC 26 September 1949-4 November 1960 | BR(E) | |
Shenfield | Wickford Junction | 6 November 1960 | 24 January 1979 | overhead; 6.25kV AC | previously electrified overhead; 1,500V DC 31 December 1956-4 November 1960 | BR(E) | |
Wickford Junction | Southend Victoria | 6 November 1960 | 24 January 1979 | overhead; 6.25kV AC | previously electrified overhead; 1,500V DC 31 December 1956-4 November 1960 | BR(E) | |
Broxbourne Junction | Hertford East | 21 November 1960 | overhead; 25kV AC | BR(E) | |||
Broxbourne Junction | Bishops Stortford | 21 November 1960 | overhead; 25kV AC | BR(E) | |||
Bury Street Junction | Enfield Town | 21 November 1960 | overhead; 25kV AC | BR(E) | |||
Cheshunt Junction | Broxbourne Junction | 21 November 1960 | overhead; 25kV AC | BR(E) | |||
Hackney Downs | Southbury | Cheshunt Junction | 21 November 1960 | overhead; 25kV AC | BR(E) | ||
Liverpool Street | Hackney Downs | 21 November 1960 | overhead; 25kV AC | BR(E) | |||
Ashford | Canterbury West | Minster | 12 June 1961 | third rail; 660V/750V DC | Kent Coast phase 2 | BR(S) | |
Folkestone Harbour branch | 12 June 1961 | 24 February 2012 | third rail; 660V/750V DC | Kent Coast phase 2 | BR(S) | ||
Maidstone East | Ashford | 12 June 1961 | third rail; 660V/750V DC | Kent Coast phase 2 | BR(S) | ||
Paddock Wood | Maidstone West | 12 June 1961 | third rail; 660V/750V DC | Kent Coast phase 2 | BR(S) | ||
Sevenoaks | Tonbridge, Ashford, Folkestone, Dover | Ramsgate | 12 June 1961 | third rail; 660V/750V DC | Kent Coast phase 2 | BR(S) | |
Runcorn | Folly Lane | 22 July 1961 | 3 January 1994 | overhead; 25kV AC | freight only | BR(M) | |
Gas Factory Junction | Woodgrange Park Junction | 6 November 1961 | overhead; 25kV AC | BR(E) | |||
Tilbury Junctions | Tilbury Riverside | 6 November 1961 | 29 November 1992 | overhead; 25kV AC | BR(E) | ||
Woodgrange Park Junction | Shoeburyness | 6 November 1961 | overhead; 25kV AC | BR(E) | |||
Woodgrange Park Junction | Forrest Gate Junction | 6 November 1961 | overhead; 25kV AC | BR(E) | |||
Crewe | Weaver Junction | 1 January 1962 | overhead; 25kV AC | BR(M) | |||
Weaver Junction | Liverpool Lime Street | 1 January 1962 | overhead; 25kV AC | BR(M) | |||
Bridge Street Junction | Smithy Lye Junction | 29 May 1962 | 1 May 1967 | overhead; 6.25kV AC | BR(Sc) | ||
Cathcart East Junction | Kirkhill, Newton, Uddingston | Motherwell | 29 May 1962 | 1 November 1973 | overhead; 6.25kV AC | BR(Sc) | |
Cathcart North Junction | Queen's Park | Muirhouse North Junction | 29 May 1962 | 1 November 1979 | overhead; 6.25kV AC | BR(Sc) | |
Cathcart West Junction | Neilston | 29 May 1962 | 1 September 1973 | overhead; 6.25kV AC | BR(Sc) | ||
Cathcart West Junction | Cathcart North Junction | 29 May 1962 | 1 November 1979 | overhead; 6.25kV AC | BR(Sc) | ||
Cathcart West Junction | Cathcart East Junction | 29 May 1962 | 1 September 1973 | overhead; 6.25kV AC | BR(Sc) | ||
Glasgow Central | Muirhouse North Junction | 29 May 1962 | 1 September 1973 | overhead; 6.25kV AC | Glasgow Central station converted to 25kV AC 25 May 1971 | BR(Sc) | |
Muirhouse Central Junction | Cathcart West Junction | 29 May 1962 | 1 September 1973 | overhead; 6.25kV AC | BR(Sc) | ||
Muirhouse North Junction | Muirhouse Central Junction | 29 May 1962 | 1 September 1973 | overhead; 6.25kV AC | BR(Sc) | ||
Smithy Lye Junction | Smithy Lye Sidings | 29 May 1962 | 1 May 1967 | overhead; 6.25kV AC | BR(Sc) | ||
Chelmsford | Colchester | 18 June 1962 | overhead; 25kV AC | BR(E) | |||
Shenfield | Chelmsford | 18 June 1962 | 24 January 1979 | overhead; 6.25kV AC | previously electrified overhead; 1,500V DC 11 June 1956-4 November 1960 | BR(E) | |
Crewe | Stafford | 7 January 1963 | overhead; 25kV AC | BR(M) | |||
Upminster | Grays | Pitsea | 17 June 1963 | overhead; 25kV AC | BR(E) | ||
Stafford | Tamworth | 8 July 1963 | overhead; 25kV AC | BR(M) | |||
Tamworth | Nuneaton | 2 March 1964 | overhead; 25kV AC | BR(M) | |||
Nuneaton | Rugby | 30 November 1964 | overhead; 25kV AC | BR(M) | |||
Tinsley Yard | Woodburn Junctions | 30 May 1965 | 20 July 1981 | overhead; 1,500V DC | BR(E) | ||
Rugby | Northampton | 9 July 1965 | overhead; 25kV AC | BR(M) | |||
Mitre Bridge Junction | West London Junction | 27 September 1965 | overhead; 25kV AC | BR(M) | |||
Northampton | Willesden Yard | 27 September 1965 | overhead; 25kV AC | BR(M) | |||
West London Junction | Willesden relief lines | Sudbury Junction | 27 September 1965 | overhead; 25kV AC | BR(M) | ||
Maiden Lane (York Way) Freightliner Terminal | Maiden Lane Junction | 15 November 1965 | 1 May 1968 | overhead; 25kV AC | BR(M) | ||
Maiden Lane Junction | Camden Junction | 15 November 1965 | overhead; 25kV AC | dual third rail; 660V/750V DC/overhead; 25kV AC out of use May 1968 until 18 April 1988 | BR(M) | ||
Euston | Willesden Yard | 22 November 1965 | overhead; 25kV AC | BR(M) | |||
Rugby | Hanslope Junction | 3 January 1966 | overhead; 25kV AC | BR(M) | |||
Bescot Junction | Portobello Junction | 18 April 1966 | overhead; 25kV AC | BR(M) | |||
Portobello Junction | Crane Street Junction | 18 April 1966 | overhead; 25kV AC | BR(M) | |||
Portobello Junction | Bushbury Junction | 18 April 1966 | overhead; 25kV AC | BR(M) | |||
Aston North Junction | Perry Barr Junctions | 3 October 1966 | overhead; 25kV AC | BR(M) | |||
Coventry | Stechford North Junction | 3 October 1966 | overhead; 25kV AC | BR(M) | |||
Perry Barr Junctions | Bescot | 3 October 1966 | overhead; 25kV AC | BR(M) | |||
Stechford North Junction | Aston South Junction | 3 October 1966 | overhead; 25kV AC | BR(M) | |||
Aston South Junction | Aston North Junction | 6 December 1966 | overhead; 25kV AC | BR(M) | |||
Bescot | Bescot Junction | 6 December 1966 | overhead; 25kV AC | made available to use 15 August 1966 | BR(M) | ||
Bescot Junction | Walsall | 6 December 1966 | overhead; 25kV AC | made available to use 15 August 1966 | BR(M) | ||
Birmingham New Street | Wolverhampton | 6 December 1966 | overhead; 25kV AC | BR(M) | |||
Perry Barr Junctions | Soho Junctions | 6 December 1966 | overhead; 25kV AC | BR(M) | |||
Proof House Junction | Aston South Junction | 6 December 1966 | overhead; 25kV AC | BR(M) | |||
Rugby | Coventry | 6 December 1966 | overhead; 25kV AC | BR(M) | |||
Wolverhampton | Stafford | 6 December 1966 | overhead; 25kV AC | BR(M) | |||
Colwich | Stone | 6 March 1967 | overhead; 25kV AC | BR(M) | |||
Norton Bridge | Cheadle Hulme | 6 March 1967 | overhead; 25kV AC | BR(M) | |||
Stechford North Junction | Birmingham New Street | 6 March 1967 | overhead; 25kV AC | BR(M) | |||
Ryde Pier Head | Shanklin | 20 March 1967 | third rail; 660V/750V DC | BR(S) | |||
Basingstoke | Bournemouth | 3 April 1967 | third rail; 660V/750V DC | BR(S) | |||
Bridge Street Junction | Smithy Lye Junction | 1 May 1967 | overhead; 25kV AC | BR(Sc) | |||
Smithy Lye Junction | Smithy Lye Sidings | 1 May 1967 | overhead; 25kV AC | BR(Sc) | |||
Lymington Branch | 2 June 1967 | third rail; 660V/750V DC | BR(S) | ||||
Smithy Lye Junction | Gourock | 5 June 1967 | overhead; 25kV AC | BR(Sc) | |||
Wemyss Bay Junction | Wemyss Bay | 5 June 1967 | overhead; 25kV AC | BR(Sc) | |||
Cheshunt Junction | Tottenham Hale | Hackney Downs | 5 May 1969 | overhead; 25kV AC | BR(E) | ||
Clapton Junction | Chingford | 5 May 1969 | overhead; 25kV AC | BR(E) | |||
Seven Sisters Junction | Tottenham South Junction | 5 May 1969 | overhead; 25kV AC | BR(E) | |||
Cornbrook Junction | Altrincham | 3 May 1971 | 24 December 1991 | overhead; 25kV AC | previously electrified overhead; 1,500V DC 11 May 1931-30 April 1971; later converted to Metrolink | BR(M) | |
Manchester Oxford Road | Cornbrook Junction | 3 May 1971 | overhead; 25kV AC | previously electrified overhead; 1,500V DC 11 May 1931-30 April 1971 | BR(M) | ||
Weaver Junction | Bamfurlong Junction | 19 March 1973 | overhead; 25kV AC | BR(M) | |||
Bamfurlong Junction | Preston | 23 July 1973 | overhead; 25kV AC | BR(M) | |||
Cathcart West Junction | Neilston | 1 September 1973 | overhead; 25kV AC | BR(Sc) | |||
Cathcart West Junction | Cathcart East Junction | 1 September 1973 | overhead; 25kV AC | BR(Sc) | |||
Glasgow Central | Muirhouse North Junction | 1 September 1973 | overhead; 25kV AC | Glasgow Central station converted to 25kV AC 25 May 1971 | BR(Sc) | ||
Muirhouse Central Junction | Cathcart West Junction | 1 September 1973 | overhead; 25kV AC | BR(Sc) | |||
Muirhouse North Junction | Muirhouse Central Junction | 1 September 1973 | overhead; 25kV AC | BR(Sc) | |||
Cathcart East Junction | Kirkhill, Newton, Uddingston | Motherwell | 1 November 1973 | overhead; 25kV AC | BR(Sc) | ||
Preston | Carlisle | 25 March 1974 | overhead; 25kV AC | date for opening to freight; passenger service began 10 April 1974 | BR(M) | ||
Carlisle | Kingmoor Yard | 25 March 1974 | overhead; 25kV AC | freight only | BR(M) | ||
Carlisle | Motherwell | 22 April 1974 | overhead; 25kV AC | full service 6 May 1974 | BR(M); BR(Sc) | ||
Lesmahgow Junction | Mossend Yard | 22 April 1974 | overhead; 25kV AC | full service 6 May 1974 | BR(Sc) | ||
Mossend Curves | 22 April 1974 | overhead; 25kV AC | full service 6 May 1974 | BR(Sc) | |||
Uddingston Junction | Bellshill | Law Junction | 22 April 1974 | overhead; 25kV AC | full service 6 May 1974 | BR(Sc) | |
Lanark Junction | Lanark | 6 May 1974 | overhead; 25kV AC | BR(Sc) | |||
Lesmahgow Junction | Newton Hamilton Junction | 6 May 1974 | overhead; 25kV AC | BR(Sc) | |||
Terminus Junction | Muirhouse Central Junction | 1975 | overhead; 25kV AC | BR(Sc) | |||
Old Street | Drayton Park | 16 August 1976 | third rail; 660V/750V DC | ex-Underground (closed 4 October 1975) | BR(E) | ||
Drayton Park | Finsbury Park | 8 November 1976 | third rail; 660V/750V DC | (equivalent Underground alignment closed 3 October 1964); opened for ECS 16 August 1976 | BR(E) | ||
Drayton Park | Welwyn Garden City | 8 November 1976 | overhead; 25kV AC | Drayton Park-Finsbury Park ex Underground closed 3 October 1964 | BR(E) | ||
Moorgate | Old Street | 8 November 1976 | third rail; 660V/750V DC | ex-Underground (closed 6 September 1975); opened for ECS 16 August 1976 | BR(E) | ||
Wood Green Junctions | Hertford North | 8 November 1976 | overhead; 25kV AC | BR(E) | |||
Liverpool Central Low Level | Exchange Junction | 2 May 1977 | third rail; 660V/750V DC | BR(M) | |||
Walton Junction | Kirby | 2 May 1977 | third rail; 660V/750V DC | BR(M) | |||
Mann Island Junction | Mann Island Junction | 9 May 1977 | third rail; 660V/750V DC | Loop; Moorfields deep level and Lime Street Low Level opened 30 October 1977 | BR(M) | ||
Cambridge Junction | Royston | 3 October 1977 | overhead; 25kV AC | BR(E) | |||
Hitchin | Cambridge Junction | 3 October 1977 | overhead; 25kV AC | BR(E) | |||
King's Cross | Hitchin | 3 October 1977 | overhead; 25kV AC | BR(E) | |||
Braintree | Witham | 31 October 1977 | overhead; 25kV AC | BR(E) | |||
Garston | Liverpool Central Low Level | 3 January 1978 | third rail; 660V/750V DC | BR(M) | |||
Dalmuir Park Junction | Drumchapel | Hyndland Junctions | 1 November 1978 | overhead; 25kV AC | BR(Sc) | ||
Westerton Junction | Milngavie | 1 November 1978 | overhead; 25kV AC | BR(Sc) | |||
Yoker | Jordanhill | 1 November 1978 | overhead; 25kV AC | BR(Sc) | |||
Liverpool Street | Shenfield | 25 January 1979 | overhead; 25kV AC | previously electrified overhead; 6.25kV AC | BR(E) | ||
Shenfield | Chelmsford | 25 January 1979 | overhead; 25kV AC | previously electrified overhead; 6.25kV AC | BR(E) | ||
Shenfield | Wickford Junction | 25 January 1979 | overhead; 25kV AC | previously electrified overhead; 6.25kV AC | BR(E) | ||
Wickford Junction | Southend Victoria | 25 January 1979 | overhead; 25kV AC | previously electrified overhead; 6.25kV AC | BR(E) | ||
Yoker | Dalmuir Park Junction | 1 March 1979 | overhead; 25kV AC | BR(Sc) | |||
Hertford North | Langley Junction | 14 May 1979 | overhead; 25kV AC | energised 6 February 1978; first passenger service 14 May 1979 | BR(E) | ||
High Street West Junction | Bridgeton | 1 June 1979 | 1 June 1987 | overhead; 25kV AC | closed to passengers 4 November 1979 | BR(Sc) | |
Jordanhill | Glasgow Queen Street Low Level | Bellgrove Junction | 1 June 1979 | overhead; 25kV AC | BR(Sc) | ||
Bellgrove Junction | Springburn | 1 August 1979 | overhead; 25kV AC | BR(Sc) | |||
Cathcart North Junction | Queen's Park | Muirhouse North Junction | 1 November 1979 | overhead; 25kV AC | BR(Sc) | ||
Cathcart West Junction | Cathcart North Junction | 1 November 1979 | overhead; 25kV AC | BR(Sc) | |||
Rutherglen Junction | Glasgow Central Low Level | Finnieston Junctions | 5 November 1979 | overhead; 25kV AC | BR(Sc) | ||
Cornbrook Junction | Trafford Park | 1980 | overhead; 25kV AC | BR(M) | |||
Buckley Wells Junction | Bury Interchange | 17 March 1980 | 16 August 1991 | third rail; 1,200V DC side contact | BR(M) | ||
Edgeley Junction | Hazel Grove | 1 June 1981 | overhead; 25kV AC | BR(M) | |||
Mossend Yard | Gartsherie South Junction | 11 August 1981 | overhead; 25kV AC | BR(Sc) | |||
Kentish Town Junction | Bedford | 28 March 1983 | overhead; 25kV AC | full service 16 May 1983 | BR(M) | ||
St Pancras | Kentish Town Junction | 28 March 1983 | overhead; 25kV AC | full service 16 May 1983 | BR(M) | ||
Hunts Cross | Garston | 16 May 1983 | third rail; 660V/750V DC | BR(M) | |||
Moorgate | Kentish Town Junction | 11 July 1983 | overhead; 25kV AC | Moorgate-Farringdon closed 20 March 2009 | BR(M) | ||
Shields Junction | Corkerhill Depot | 1 October 1984 | overhead; 25kV AC | BR(Sc) | |||
Manchester Piccadilly | Glossop/Hadfield | 9 December 1984 | overhead; 25kV AC | previously electrified overhead; 1,500V DC 14 June 1954-7 December 1984 | BR(M) | ||
Colchester | Ipswich | 17 April 1985 | overhead; 25kV AC | full service 13 May 1985 | BR(E) | ||
Camden Road Central Junction | Camden Road Incline Junction | 6 May 1985 | overhead; 25kV AC | brought into use by 27 September 1985 | BR(M) | ||
Camden Road Incline Junction | York Way North Junction | 6 May 1985 | overhead; 25kV AC | brought into use by 27 September 1985 | BR(M) | ||
York Way North Junction | Freight Terminal Junction | 6 May 1985 | overhead; 25kV AC | brought into use by 27 September 1985 | BR(M) | ||
Dalston Junction | Channelsea South Junction | 13 May 1985 | third rail; 660V/750V DC | energised 14 January 1985 | BR(E) | ||
Channelsea South Junction | Stratford Low Level | 13 May 1985 | 9 April 2009 | third rail; 660V/750V DC | energised 14 January 1985 | BR(E) | |
Stratford Low Level | North Woolwich | 13 May 1985 | 10 December 2006 | third rail; 660V/750V DC | energised 14 January 1985; public operation ceased after end of service 9 December 2006; a special ran the next day | BR(E) | |
Rock Ferry | Hooton | 30 September 1985 | third rail; 660V/750V DC | BR(M) | |||
Tonbridge | St Leonards (Hastings) | 28 April 1986 | third rail; 660V/750V DC | full service 12 May 1986 | BR(S) | ||
Maningtree | Harwich | 12 May 1986 | overhead; 25kV AC | BR(E) | |||
Upminster | Romford | 12 May 1986 | overhead; 25kV AC | BR(E) | |||
Wickford Junction | Southminster | 12 May 1986 | overhead; 25kV AC | BR(E) | |||
Reading Lane Junction | Navarino Road Junction | 30 June 1986 | 25 September 1992 | third rail; 660V/750V DC | BR(M) | ||
Ipswich | Stowmarket | 7 August 1986 | overhead; 25kV AC | BR(E) | |||
Paisley Gilmour Street | Ayr | 28 September 1986 | overhead; 25kV AC | BR(Sc) | |||
Cambridge Junction | Huntingdon | 3 November 1986 | overhead; 25kV AC | BR(E) | |||
Dubbs Junction | Byrehill Junction | 24 November 1986 | overhead; 25kV AC | BR(Sc) | |||
Kilwinning Junction | Ardrossan South Beach | 24 November 1986 | overhead; 25kV AC | BR(Sc) | |||
Ardrossan South Beach | Largs | 19 January 1987 | overhead; 25kV AC | BR(Sc) | |||
Bishops Stortford | Cambridge | 19 January 1987 | overhead; 25kV AC | full service 11 May 1987 | BR(E) | ||
Holm Junction | Ardrossan Harbour | 19 January 1987 | overhead; 25kV AC | BR(Sc) | |||
Huntingdon | Peterborough | 8 May 1987 | overhead; 25kV AC | BR(E) | |||
Stowmarket | Norwich | 11 May 1987 | overhead; 25kV AC | BR(E) | |||
South Croydon | East Grinstead | 19 September 1987 | third rail; 660V/750V DC | energised 20 July 1987; full service 5 October 1987 | BR(S) | ||
(Finsbury Park) 2m 2ch | Highbury Vale Junction | 14 April 1988 | overhead; 25kV AC | up Canonbury line | BR(E) | ||
Canonbury West Junction | Finsbury Park South Junction | 14 April 1988 | overhead; 25kV AC | down Canonbury line | BR(E) | ||
Channelsea South Junction | Stratford Central Junction | 14 April 1988 | overhead; 25kV AC | BR(E) | |||
Maiden Lane Junction | Channelsea South Junction | 14 April 1988 | overhead; 25kV AC | also third rail; 660V/750V DC until 1 June 2010 (dual system) | BR(E); BR(M) | ||
Shepreth Branch Junction | Royston | 2 May 1988 | overhead; 25kV AC | installed by BR(E); full service 16 May 1988 shortly after BR(A) separated out | BR(A) | ||
Branksome | Weymouth | 16 May 1988 | third rail; 660V/750V DC | BR(S) | |||
Farringdon | Blackfriars | 16 May 1988 | third rail; 660V/750V DC | Farringdon-City Thameslink also overhead; 25kV AC from 8 May 2012 (dual system) | BR(S) | ||
Reading Lane Junction | Navarino Road Junction | 30 June 1988 | 25 September 1992 | overhead; 25kV AC | BR(M) | ||
Peterborough | Doncaster | 3 July 1988 | overhead; 25kV AC | BR(E) | |||
Watford Junction | St Albans Abbey | 11 July 1988 | overhead; 25kV AC | BR(M) | |||
Doncaster | Leeds | 12 August 1988 | overhead; 25kV AC | BR(E) | |||
Airdrie | Drumgelloch | 15 May 1989 | overhead; 25kV AC | BR(Sc) | |||
Temple Mills East Junction | Coppermill North Junction | 4 September 1989 | overhead; 25kV AC | BR(A) | |||
Doncaster | York | 23 September 1989 | overhead; 25kV AC | BR(E) | |||
Stratford Central Junction East | Temple Mills East Junction | 8 October 1989 | overhead; 25kV AC | BR(A) | |||
Whifflet South Junction | Sunnyside Junction | 11 November 1989 | overhead; 25kV AC | BR(Sc) | |||
Eastleigh | Fareham | 14 May 1990 | third rail; 660V/750V DC | BR(S) | |||
St Denys | Farlingham/Portcreek Junctions | 14 May 1990 | third rail; 660V/750V DC | BR(S) | |||
Carstairs | Haymarket Platforms 3/4 | Princes Street Gardens | 18 March 1991 | overhead; 25kV AC | BR(Sc) | ||
Princes Street Gardens | Edinburgh | 18 March 1991 | overhead; 25kV AC | lines W and Z, Edinburgh Waverley through platforms and east end bays | BR(Sc) | ||
Stansted Junctions | Stansted Airport | 19 March 1991 | overhead; 25kV AC | BR(A) | |||
York | Newcastle | 10 June 1991 | overhead; 25kV AC | BR(E) | |||
Newcastle | Edinburgh | 12 June 1991 | overhead; 25kV AC | BR(E); BR(Sc) | |||
Drem Junction | North Berwick | 8 July 1991 | overhead; 25kV AC | BR(Sc) | |||
Portobello Junction | Newcraighall | Monktonhall Junction | 8 July 1991 | overhead; 25kV AC | BR(Sc) | ||
Cambridge | King's Lynn | 22 August 1992 | overhead; 25kV AC | full service 24 August 1992 | BR(A) | ||
Mitre Bridge Junction | Westway | 11 November 1992 | overhead; 25kV AC | BR(S) | |||
Aston North Junction | Lichfield Trent Valley | 30 November 1992 | overhead; 25kV AC | one public electric train ran 26 November 1992, northbound only (returned empty) | BR(M) | ||
Waterloo | Bank | 19 July 1993 | 1 April 1994 | fourth rail; 660V DC | transferred to London Underground | BR(S) | |
Clapham Junction area connections | 8 March 1993 | third rail; 660V/750V DC | BR(S) | ||||
Clapham West London Junction | Westway | 8 March 1993 | third rail; 660V/750V DC | passenger service Clapham Junction-Kennsington Olympia 26 July 1993 | BR(S) | ||
Stewarts Lane Viaduct | 8 March 1993 | third rail; 660V/750V DC | BR(S) | ||||
Heald Green North Junction | Manchester Airport | 16 May 1993 | overhead; 25kV AC | first train 23:25 Manchester Airport-York | BR(M) | ||
Birmingham New Street | Redditch | 12 July 1993 | overhead; 25kV AC | BR(M) | |||
Hooton | Chester | 3 September 1993 | third rail; 660V/750V DC | BR(M) | |||
Redhill | Tonbridge | 6 March 1994 | third rail; 660V/750V DC | BR(S) | |||
Hooton | Ellesmere Port | 21 May 1994 | third rail; 660V/750V DC | RT | |||
Cheriton | Channel Tunnel | Coquelles | 1 June 1994 | overhead; 25kV AC | initially for freight; truck shuttle started 19 May 1994; Eurostar started 14 November 1994; car shuttle started 3 October 1994 | CT | |
Stewarts Lane chord | 14 November 1994 | third rail; 660V/750V DC | commissioned 2 May 1993 | RT | |||
Vauxhall flyover | 14 November 1994 | third rail; 660V/750V DC | commissioned 2 May 1993 | RT | |||
Apperley Junction | Ilkley | 28 May 1995 | overhead; 25kV AC | RT | |||
Leeds | Apperley Junction | 28 May 1995 | overhead; 25kV AC | RT | |||
Apperley Junction | Shipley Junctions | 24 September 1995 | overhead; 25kV AC | RT | |||
Shipley Junctions | Bradford Forster Square | 24 September 1995 | overhead; 25kV AC | RT | |||
Shipley Junctions | Skipton | 24 September 1995 | overhead; 25kV AC | RT | |||
Heald Green West Junction | Heald Green South Junction | 15 January 1996 | overhead; 25kV AC | RT | |||
Acton Central | Willesden Junction High Level | 29 September 1996 | overhead; 25kV AC | previously electrified third rail; 660V/750V DC 1 October 1916-27 September 1996 | RT | ||
former Earl's Court Junction | Clapham Junction | 29 September 1996 | third rail; 660V/750V DC | RT | |||
Kensal Green Junction | Harlesden Junction | 29 September 1996 | overhead; 25kV AC | RT | |||
Willesden Junction High Level | Camden Road West Junction | 29 September 1996 | overhead; 25kV AC | previously electrified third rail; 660V/750V DC 1 October 1916-28 October 1995 | RT | ||
Mitre Bridge Junction | Willesden Junction High Level | 16 April 1997 | overhead; 25kV AC | RT | |||
Paddington | Airport Junction | 19 January 1998 | overhead; 25kV AC | RT | |||
Airport Junction | Heathrow Junction platform | 19 January 1998 | overhead; 25kV AC | Heathrow Junction platform last used 23 May 1998 | RT | ||
Heathrow Junction | Heathrow Terminals 123 | 25 May 1998 | overhead; 25kV AC | HA | |||
Heathrow Terminals 123 | Heathrow Terminal 4 | 25 May 1998 | overhead; 25kV AC | HA | |||
Crewe | Kidsgrove | 24 August 2003 | overhead; 25kV AC | NR | |||
Fawkham Junction | MP 21.25 | 28 September 2003 | overhead; 25kV AC | CTRL | |||
Fawkham Junction | Channel Tunnel | 28 September 2003 | overhead; 25kV AC | CTRL | |||
Haughhead Junction | Larkhall | 12 December 2005 | overhead; 25kV AC | NR | |||
Camden Road Incline Junction | Cedar Junction | 17 February 2007 | overhead; 25kV AC | NR | |||
Cedar Junction | York Way South Junction | 17 February 2007 | overhead; 25kV AC | NR | |||
Cedar Junction | Silo Curve Junction | 17 February 2007 | overhead; 25kV AC | NR | |||
Regents Canal Junction | St Pancras International | 17 February 2007 | overhead; 25kV AC | international passenger service 14 November 2007; domestic passenger service 29 June 2009 | CTRL | ||
Regents Canal Junction | York Way South Junction | 17 February 2007 | overhead; 25kV AC | international passenger service 14 November 2007; domestic passenger service 29 June 2009 | CTRL | ||
Silo Curve Junction | Regents Canal Junction | 17 February 2007 | overhead; 25kV AC | CTRL | |||
York Way North Junction | Silo Curve Junction | 17 February 2007 | overhead; 25kV AC | CTRL | |||
York Way South Junction | Fawkham Junction | 17 February 2007 | overhead; 25kV AC | international passenger service 14 November 2007; domestic passenger service 29 June 2009 | CTRL | ||
Terminus Junction | Shields Junction | 1 February 2008 | overhead; 25kV AC | NR | |||
Heathrow Terminals 123 | Heathrow Terminal 5 | 27 March 2008 | overhead; 25kV AC | HA | |||
Princes Street Gardens | Edinburgh | 18 May 2008 | overhead; 25kV AC | lines X and Y, Edinburgh Waverley west end bays | NR | ||
Channelsea South Junction | Stratford new platforms 1/2 | 14 April 2009 | overhead; 25kV AC | NR | |||
Ebbsfleet West Junction | Church Path voltage change | 13 December 2009 | overhead; 25kV AC | CTRL | |||
Dock Junction | New Cross Gate | 27 April 2010 | third rail; 660V/750V DC | NR | |||
Dock Junction | Shoreditch | 27 April 2010 | third rail; 660V/750V DC | NR | |||
New Cross | Dock Junction | 27 April 2010 | third rail; 660V/750V DC | NR | |||
Shoreditch | Dalston Junction | 27 April 2010 | third rail; 660V/750V DC | re-opening date | NR | ||
Haymarket East Junction | Newbridge Junction, Bathgate | Drumgelloch | 12 December 2010 | overhead; 25kV AC | NR | ||
Dalston Junction | Highbury & Islington | 28 February 2011 | third rail; 660V/750V DC | NR | |||
Princes Street Gardens | Haymarket Platforms 0, 1, 2 | Haymarket Central Junction | 22 May 2011 | overhead; 25kV AC | NR | ||
Farringdon | City Thameslink | 8 May 2012 | overhead; 25kV AC | overlaid on existing third rail; 660V/750V system (dual system) | NR | ||
Corkerhill Depot | Paisley Canal | 19 November 2012 | overhead; 25kV AC | NR | |||
Castlefield Junction | Ordsall Lane Junction | 9 December 2013 | overhead; 25kV AC | NR | |||
Ordsall Lane Junction | Eccles | Newton Le Willows Junction | 9 December 2013 | overhead; 25kV AC | NR | ||
Parkside Junction | Lowton Junction | 9 December 2013 | overhead; 25kV AC | NR | |||
Gartcosh Junction | Garnqueen North Junction | 18 May 2014 | overhead; 25kV AC | NR | |||
Gartcosh Junction | Sighthill East Junction | 18 May 2014 | overhead; 25kV AC | NR | |||
Gartsherie South Junction | Cumbernauld | 18 May 2014 | overhead; 25kV AC | NR | |||
Gartsherie South Junction | Gartcosh Junction | 18 May 2014 | overhead; 25kV AC | NR | |||
Sighthill East Junction | Springburn 0m 59ch | 18 May 2014 | overhead; 25kV AC | NR | |||
Sighthill East Junction | Sighthill West Junction | 18 May 2014 | overhead; 25kV AC | NR | |||
Sighthill West Junction | Cowlairs South Junction | 18 May 2014 | overhead; 25kV AC | passenger use from 9 December 2018 | NR | ||
Langloan Junction | Whifflet North Junction | 14 December 2014 | overhead; 25kV AC | available from 29 September 2014 | NR | ||
Rutherglen East Junction | Langloan Junction | 14 December 2014 | overhead; 25kV AC | available from 29 September 2014 | NR | ||
Earlstown East Junction | Huyton Junction | 5 March 2015 | overhead; 25kV AC | NR | |||
Earlstown South Junction | Earlstown West Junction | 5 March 2015 | overhead; 25kV AC | NR | |||
Huyton Junction | Waterloo Branch Junction | 5 March 2015 | overhead; 25kV AC | NR | |||
Ordsall Lane Junction | Windsor Bridge Junction | 5 March 2015 | overhead; 25kV AC | NR | |||
Langloan Junction | Coatbridge Junction | 31 March 2015 | overhead; 25kV AC | NR | |||
Sighthill West Junction | Cowlairs West Junction | 31 March 2015 | overhead; 25kV AC | NR | |||
Huyton Junction | Springs Branch Junction | 25 April 2015 | overhead; 25kV AC | NR | |||
Ince Moss Junction | Bamfurlong Junction | 25 April 2015 | overhead; 25kV AC | first electric train 4 April 2017 | NR | ||
Manchester Victoria | Deal Street Junction | 18 May 2015 | overhead; 25kV AC | NR | |||
Ordsall Lane Junction | Deal Street Junction | 18 May 2015 | overhead; 25kV AC | energised 14 September 2014 | NR | ||
Airport Junction | Maidenhead | 21 May 2017 | overhead; 25kV AC | energised 25 March 2017 | NR | ||
Irwell Street Junction | Water Street Junction | 10 December 2017 | overhead; 25kV AC | energised 2 October 2017 | NR | ||
Newbridge Junction | Glasgow Queen Street | 10 December 2017 | overhead; 25kV AC | NR | |||
Maidenhead | Reading | 28 December 2017 | overhead; 25kV AC | NR | |||
Reading | Didcot | 28 December 2017 | overhead; 25kV AC | energised 16 July 2016 | NR | ||
Manchester Victoria | Miles Platting Junction | 20 May 2018 | overhead; 25kV AC | NR | |||
Miles Platting Junction | Phillips Park West Junction | 20 May 2018 | overhead; 25kV AC | NR | |||
Baguley Fold Junction | Phillips Park West Junction | 20 May 2018 | overhead; 25kV AC | NR | |||
Newton Heath depot | Miles Platting Junction | 20 May 2018 | overhead; 25kV AC | NR | |||
Phillips Park South Junction | Baguley Fold Junction | 20 May 2018 | overhead; 25kV AC | NR | |||
Phillips Park South Junction | Ashburys West Junction | 20 May 2018 | overhead; 25kV AC | NR | |||
Phillips Park South Junction | Phillips Park West Junction | 20 May 2018 | overhead; 25kV AC | NR | |||
Phillips Park West Junction | Brewery Junction | 20 May 2018 | overhead; 25kV AC | NR | |||
Preston | Blackpool North | 20 May 2018 | overhead; 25kV AC | NR | |||
Carmuirs East Junction | Larbert Junction | 21 May 2018 | overhead; 25kV AC | NR | |||
Carmuirs West Junction | Larbert Junction | 21 May 2018 | overhead; 25kV AC | NR | |||
Larbert Junction | Larbert | 21 May 2018 | overhead; 25kV AC | NR | |||
Carmuirs East Junction | Carmuirs West Junction | 1 June 2018 | overhead; 25kV AC | NR | |||
Carmuirs West Junction | Greenhill Lower Junction | 1 June 2018 | overhead; 25kV AC | NR | |||
Grangemouth Junction | Grangemouth | 1 June 2018 | overhead; 25kV AC | NR | |||
Greenhill Lower Junction | Greenhill Upper Junction | 1 June 2018 | overhead; 25kV AC | NR | |||
Polmont Junction | Carmuirs East Junction | 1 June 2018 | overhead; 25kV AC | NR | |||
Greenhill Lower Junction | Cumbernauld | 2 June 2018 | overhead; 25kV AC | NR | |||
Woodgrange Park Junction | Gospel Oak Junction | 4 July 2018 | overhead; 25kV AC | first test train 8 January 2018; first revenue freight 4 July 2018; first passenger train 28 January 2019 | NR | ||
Barnt Green | Bromsgrove | 29 July 2018 | overhead; 25kV AC | NR | |||
Harringay Junction | Harringay Park Junction | 8 September 2018 | overhead; 25kV AC | NR | |||
Didcot | Swindon | 18 October 2018 | overhead; 25kV AC | NR | |||
Tinsley Junction | Rotherham | Parkgate | 25 October 2018 | overhead; 750V DC | 'tram-train' system, main line running section | NR | |
Larbert | Stirling Middle Junction | 9 December 2018 | overhead; 25kV AC | NR | |||
Stirling Middle Junction | Dunblane | 9 December 2018 | overhead; 25kV AC | NR | |||
Stirling Middle Junction | Alloa | 9 December 2018 | overhead; 25kV AC | NR | |||
Reading | Newbury | 30 December 2018 | overhead; 25kV AC | NR | |||
Reading West Curve | 30 December 2018 | overhead; 25kV AC | NR | ||||
Swindon | Bristol Parkway | 30 December 2018 | overhead; 25kV AC | NR | |||
Barking Station Junction | Barking Platform 1 | 28 January 2019 | overhead; 25kV AC | first test train 8 January 2018 | NR | ||
Deal Street Junction | Windsor Bridge Junction | 11 February 2019 | overhead; 25kV AC | NR | |||
Windsor Bridge Junction | Bolton | Euxton Junction | 11 February 2019 | overhead; 25kV AC | NR | ||
Midcalder Junction | Shotts | Holytown Junction | 20 April 2019 | overhead; 25kV AC | NR | ||
Wootton Bassett Junction | Chippenham | 21 April 2019 | overhead; 25kV AC | NR | |||
Walsall | Rugeley North Junction | 18 May 2019 | overhead; 25kV AC | commissioned 20 December 2018 | NR | ||
Severn Tunnel (15m 37ch) | Newport | 15 December 2019 | overhead; 25kV AC | NR | |||
Bristol Parkway | Severn Tunnel (11m 1ch) | 15 December 2019 | overhead; 25kV AC | NR | |||
Newport | Cardiff Central | 5 January 2020 | overhead; 25kV AC | NR | |||
Severn Tunnel (11m 1ch) | Severn Tunnel (15m 37ch) | 5 June 2020 | overhead; 25kV AC | NR | |||
Bedford | Kettering | 1 May 2021 | overhead; 25kV AC | NR | |||
Kettering | Corby | 1 May 2021 | overhead; 25kV AC | NR | |||
Abbey Wood | Paddington | 24 May 2022 | overhead; 25kV AC | first test train by 20 May 2019 | CR | ||
Riverside Junction | Barking Riverside | 18 July 2022 | overhead; 25kV AC | first test train 24 May 2022 | NR | ||
Westbourne Park Junction | Paddington [low level] | 6 November 2022 | overhead; 25kV AC | NR; CR | |||
Stepney Green Junction | Pudding Mill Lane Junction | 6 November 2022 | overhead; 25kV AC | first test train 20 May 2019 | CR; NR | ||
Cardiff Central | Canton depot | 4 April 2023 | overhead; 25kV AC | energisation date; non-passenger line | NR | ||
Cathays | Radyr | 3 May 2023 | overhead; 25kV AC | energisation date | TW | ||
Muirhouse Junction | Barrhead | 11 December 2023 | overhead; 25kV AC | energised 29 October 2023; first test train 5 or 7 November 2023 | NR | ||
Busby Junction | East Kilbride | 2023 | overhead; 25kV AC | energisation date | NR | ||
Guide Bridge | Stalybridge | 1 January 2024 | overhead; 25kV AC | energisation date | NR | ||
Radyr | Taffs Well | 3 April 2024 | overhead; 25kV AC | first test train date; energised 3 May 2023 | TW | ||
Waun-Gron Park (just south) | Radyr | 3 April 2024 | overhead; 25kV AC | first test train date; energised 3 May 2023 | TW | ||
Pontypridd | Treherbert | 26 May 2024 | overhead; 25kV AC | energisation date | TW | ||
Kettering | Wigston | 28 July 2024 | overhead; 25kV AC | energisation date | NR | ||
Stalybridge | Baguley Fold Junction | 5 August 2024 | overhead; 25kV AC | energised 1 January 2024; first test train 17 March 2024 | NR | ||
Treforest | Merthyr viaduct | 15 November 2024 | overhead; 25kV AC | energised 8 October 2023 | TW | ||
Abercynon | Cwmbach | 15 November 2024 | overhead; 25kV AC | energised 8 October 2023 | TW | ||
Wigan Station Junction | Crow Nest Junction | Lostock Junction | 1 January 2025 | overhead; 25kV AC | energisation date | NR | |
Basingstoke | Reading | planned | |||||
Bridgend | Maesteg | planned | |||||
Bristol Parkway | Filton | Bristol Temple Meads | planned | ||||
Cardiff | Barry Island | planned | |||||
Cardiff Queen Street | Rhymney | planned | |||||
Coventry | Nuneaton | planned | |||||
Didcot | Oxford | planned | |||||
Ebbw Junction | Ebbw Vale | planned | |||||
Heath Junction | Coryton | planned | |||||
Wigston | Nottingham | planned | |||||
Leamington | Coventry | planned | |||||
Leeds | Colton Junction | planned | |||||
Maidenhead | Marlow | planned | |||||
Manchester Victoria | Leeds | planned | |||||
Micklefield Junction | Selby | planned | |||||
Oxford | Leamington | planned | |||||
Penarth | Cogan Junction | planned | |||||
Slough | Windsor | planned | |||||
Southampton Millbrook | Basingstoke | planned | |||||
Trent East Junction | Sheffield | planned | |||||
Twyford | Henley | planned | |||||
Chippenham | Bath | Bristol Temple Meads | planned |