Last update 5 May 2023
Mileages are given in the form miles.chains unless stated otherwise. Figures prefixed with ≈ are approximate, those in parentheses are not on this route but are given for reference. Reference to 'start'/'end' of an asset are as read down the page.
Original measure 0.00 junction with ABD (19.59) 0.23 MOUNTAIN ASH 0.38 junction with ABD (20.16) Measure sometimes used 19.59 junction with ABD 20.02 MOUNTAIN ASH 20.17 junction with ABD (20.16) Measure used briefly in 2022 documentation in error, soon corrected 0.00 junction with ABD (20.16) 0.23 MOUNTAIN ASH 0.38 junction with ABD (19.60) Note that a 2022 signalling plan suggests that MOA applies to the down line only. This does not correlate with mapping evidence that shows a significant deviation from ABD, particularly at the low mileage end, to the up (northbound) side of the line. The Sectional Appendix to the Working Timetable applies to both lines.